Product name: Medium duty racking system Product description: Standard Specification: 1. All the racks could be dismantled and assembled freely by yourself. 2. Recyclable materials could eternally build a friendly environment. 3. Directly to put the goods or stack boxes on the shelf. 4....
Product description:
Standard Specification:
1. All the racks could be dismantled and assembled freely by yourself.
2. Recyclable materials could eternally build a friendly environment.
3. Directly to put the goods or stack boxes on the shelf.
4. Convenient for classification of the species of merchandises.
5. Reasonable design concept to upgrade the efficiency of storage management.
Advantage:
1. Knock down structure, easy transportation, help you save more delivery freight.
2. Complete organization department and promise every customers enjoy the luxury service.
3. We have purchasing, sales, documentary, logistic departments to promise well proceeding of your order.
4. Our shelves and racks have got CE Certificate and ensure freely entering into Europe market.
5. Popular design of shelves to exposure your brand of products.
Production Process:
Material Preparation:Carefully selected the material, get well preparation for the next craftsmanship;
Cutting Material: Based on the size and design of products, to cut down each parts of the shelves
Bending steel: According to the workmanship of shelves, to bend the steel for purpose of matching the racks
Punching: Through punching machine, to perforate holes to each corner of steel board, this step allow each rack to combine with each other
Rolling: Processing the rolling machine then shape the steel to finish one basic racks construction
Polishing: This polishing machinery is mainly to wash out the ray abrasive damage layer and make the surface bright as one mirror.
Welding: Making welds for joints of racks and further finish the racks components
Acid Washing and Phosphating: This workmanship is aim to prevent the corrosion of steel to some extent, and function of protecting the basic body of racks. In another aspect, laying the foundation before coating could improve the adhesion and corrosion resistance of paint film and in the cold metal processing, to reduce friction lubrication.
Spray Painting and Drying: Professional spray painting machine evenly like to put on one new colorful clothes for steel board, the color could be optional then drying the steel board.
FAQ:
1. Q: What is your delivery time?
A: In general, within 15 days. It also depends on the order quantity and shelving design.
2. Q: What is the term of payment?
A: Payment terms: 30% of deposit upon signing the PI, and balance will be cleared by T/T before delivery.
3. Q: Are samples available?
A: Yes, samples are available at any time. We charge some sample cost and will return it during the next order.
4. Q: How could I install the racks?
A: We provide detailed install instruction for every type of shelf. If needed,we can also ask engineers to teach you for free.
5. Q: Could you produce according to customers’ design?
A: Sure, we have very rich experience in customizing shelves.
Hi! Click one of our members below to chat on